(1)
Петровский, А. И. CONSOLIDATED STANDARDS AS A COST-EFFECTIVE METHOD FOR DETERMINING THE COST OF CONSTRUCTION. ГМУ_УЗ 2020, 1 (4), 283-287. https://doi.org/10.22394/2079-1690-2020-1-4-283-287.